Here are the Day 0 (9/29/2008) pictures:
Windows Live Spaces
Here are the day 1 (9/30/2008) pictures:
Windows Live Spaces
Here are the day 2 (10/02/2008) pictures:
Windows Live Spaces
Here are the day 3 (10/03/2008) pictures:
Windows Live Spaces
Here are the day 4 (10/11/2008) pictures:
Windows Live Spaces
Here are the day 5 (10/19/08) pictures:
Windows Live Spaces
Here are the day 6 (10/22/08) pictures:
Windows Live Spaces
Here are the day 7 (10/23/08) pictures:
Windows Live Spaces
Here are the daY 8 (10/24/08) pictures:
Windows Live Spaces
Here are the day 9 (10/29/08) pictures:
Windows Live Spaces
Here are the day 10 (11/1/08) pictures:
Windows Live Spaces
Here are the day 11 (11/03/08) pictures:
Windows Live Spaces
Here are the day 12 (11/06/08) pictures:
Windows Live Spaces
Here are the day 13 (11/07/08) pictures:
Windows Live Spaces
Here are the day 14 (11/08/08) pictures:
Windows Live Spaces
Day 15 (11/19/08) No pictures, just a quick update:
Nothing visually interesting is going on. The contractor is putting new subfloor on top of the old subfloor downstairs to stiffen it up.
The inspector came today and we passed! Yipee!!! The contractor couldn't complete the outside until hurricane ties were inspected. Now they can Tyvec, put up the insulation board and siding. It looks like they'll be doing that next week.
The town Inspectors were backed up because they all had to go to code training for 2 weeks! That's right boys and girls, all of them at the same time! Today was the first day that we could get an appointment.
The plumber is coming in tomorrow and Friday to rip out all old equipment (hot water tank, all plumbing that is not staying, heater, etc.) Then he will be back starting Monday to put new plumbing in place.
So there haven't been any updated pictures for a while. I might upload some this weekend as the contractor is almost done with a small extension of the floor in the kitchen to give us a little more room. You'll understand when you see the pictures.